GSK
The Workplace Technology Group was appointed to deliver integrated audiovisual and structured cabling solutions for GlaxoSmithKline’s new 13-floor London headquarters at 79 New Oxford Street,...
The Workplace Technology Group was appointed to deliver integrated audiovisual and structured cabling solutions for GlaxoSmithKline’s new 13-floor London headquarters at 79 New Oxford Street,...
The Cabling Group was appointed to deliver the structured cabling infrastructure for Covington’s new London office at 22 Bishopsgate, supporting a resilient and high-performance workplace...
The Cabling Group was appointed to deliver the communications infrastructure for the landmark Grade II listed Battersea Power Station, balancing modern connectivity requirements with the...
The Cabling Group was appointed to deliver a comprehensive structured cabling solution for Deutsche Bank’s new London head office located at 21 Moorfields.