Battersea Power Station
The Cabling Group was appointed to deliver the communications infrastructure for the landmark Grade II listed Battersea Power Station, balancing modern connectivity requirements with the...
We partnered with APC, CPI, Ortronics and Draka on the project.
The relocation required a robust communications infrastructure to be integrated into a high-profile multi-floor Cat B fit-out, with resilient backbone connectivity and reliable wireless coverage across the new workplace.
A comprehensive Category 6A copper and OM4 fibre solution, including diverse backbone routes, patching frames, cabinet infrastructure and WAPs. The solution provides reliable connectivity and resilience across the new Covington workspace.
The Cabling Group was appointed to deliver the communications infrastructure for the landmark Grade II listed Battersea Power Station, balancing modern connectivity requirements with the...
The Cabling Group was appointed to deliver a comprehensive structured cabling solution for Deutsche Bank’s new London head office located at 21 Moorfields.
The Cabling Group was appointed to deliver a new structured cabling solution for Deloitte’s Manchester office, supporting the development of a secure and high-performance network...