Covington & Burling
The Cabling Group was appointed to deliver the structured cabling infrastructure for Covington’s new London office at 22 Bishopsgate, supporting a resilient and high-performance workplace...
The Cabling Group worked on the regeneration of the Grade II listed Battersea Power Station, encompassing approximately 125 retail, food and beverage units, 253 residential homes and a 2,000+ capacity event venue. The works included converged networks, private mobile radio, cellular DAS and integrated reception systems.
We partnered with Excel/Mayflex, Connectix, PMRS and DAS on the project.
into an iconic listed building while supporting a complex mix of residential, retail, hospitality and event uses. Modern technology needed to be integrated without compromising the character and heritage of the site.
A converged communications infrastructure incorporating structured cabling, private mobile radio, distributed antenna and integrated reception systems. The approach placed robust, future-ready technology at the heart of the development while respecting its historic fabric.
The Cabling Group was appointed to deliver the structured cabling infrastructure for Covington’s new London office at 22 Bishopsgate, supporting a resilient and high-performance workplace...
The Cabling Group was appointed to deliver a comprehensive structured cabling solution for Deutsche Bank’s new London head office located at 21 Moorfields.
The Cabling Group was appointed to deliver a new structured cabling solution for Deloitte’s Manchester office, supporting the development of a secure and high-performance network...